Zusätzliche Angaben\
1) COSTA receives funding from the Federal Republic of Germany, represented by the Federal Ministry of Digital Affairs and\
Transport, located at Invalidenstraße 44, 10155 Berlin, which is represented by the Federal Agency for Administrative Services,\
located at Schlossplatz 9, 26603 Aurich (grantor) under grant number 45 BT008001 for the installation of a shore power system on\
both sides on board the cruise ship AIDAnova.\
The funding project is summarised as follows:\
The AIDAnova will begin voyages from German ports offering shore power supply in the coming 2023 summer season. To make\
use of the facility, the AIDAnova is to be equipped with a shore power system on both sides of the ship. On the starboard side, there\
is already a prepared room and a shell door. In order to make shore power usable in Hamburg and Kiel, among other places, a\
further room is to be created on the port side with a new shell door. Two HVSC switchboards must be installed and wired. A section\
for the shore power system has to be added to the main switchboard. In ad-dition, an adaptation of the ship's automation and power\
management system has to be made.\
The provisions underlying the grant obligate COSTA to conduct the present award procedure on the basis of the Sub-Threshold\
Award Regulation (Unterschwellenvergabeordnung - UVgO) (with the exception of Section 22, 28 (1) sentence 3, 30, 38(2) to (4),\
44 and 46 UVgO).\
The services subject to the procedure shall be awarded in a public invitation to tender pursuant to Section 8 (1) in conjunction with\
Section 9 UVgO, without application of Sections 22, 28 (1) sentence 3, 30, 38 (2) to (4), 44 and 46 UVgO and in accordance with\
these procedural provisions.\
2) A ship visit can be carried out preferable in any port within the Itinerary (see Annex 3 Itinerary), preferred Las Palmas, Gran\
Canaria or Santa Cruz de Tenerife or Kiel.\
Flight and travel costs for survey purpose cannot be charged to the contracting party.\
If the bidder wishes to make use of the possibility of an inspection appointment, it must arrange this in advance with Mr Tim\
Wolfram by telephone on +49 (0) 152 29897924 or by e-mail to
[email protected].\
3) The bidders must ensure that the procedural and contractual documents are complete immediately after receipt (download). If,\
in the opinion of a bidder, there are ambiguities, doubts or contradictions in the documents, these must be communicated to the\
contracting party immediately in the form of a bidder's question.\
Questions regarding the tender must be submitted in English only via the award portal used.\
All questions will be answered via the award portal (bidder communication). In this respect, it is pointed out that the bidders must\
inform themselves independently about the current status of the selection procedure by regularly consulting the award portal.\
Information by e-mail is technically only possible if the bidder registers on the award portal with an e-mail address.\
No information on the status of the selection procedure will be given by telephone or in writing.\
4) The contracting party will not reimburse any costs for participation in the procedure, in particular for the preparation of tenders.\
The same shall apply to any participation in an inspection date (cf. para. VI).\
5) A European self-declaration in accordance with § 50 UVgO does not meet the requirements set out below and will therefore not\
be accepted.\
6) Conditions for the order\
a) Qualification\
The personnel to be used for the execution of the contract specific work shall be certified welders and technicians for required\
welding works.\
The certificates for the personnel used for the execution of the contract specific work must be presented to the contracting party\
after awarding but before the execution of the contract begins.\
b) Communication\
All communication with the tenderer and the technical staff employed by it to perform the contract shall be in English. The\
representatives of the tenderer and the technical staff employed by it for the performance of the contract must therefore be fluent in\
written and spoken English.\
c) Identity documents and permits\
The technical personnel employed by the tenderer to perform the contract must have the necessary valid identification documents,\
visas, permits, etc. to be allowed to per-form the contract during the operation of the cruise ship on the high seas.\
d) Credit check\
For the performance of the credit check of the bidder designated for the award of the contract, reference is made to Clause 5.5 of\
the product and service agreement (Annex 2).\
Bekanntmachungs-ID: CXP4DRC6F1H